| NORTH TEXAS TOLLWAY AUTHORITY (NTTA) STATE HIGHWAY 161 |
| PHASE 2 AND 3, IRVING, TX |
|
 |
| |
| Description: 11.5 Mile loop system in Dallas, TX includes North & Southbound 2.3 mile bridge span over the Trinity River. This North Texas Bridge structure required the use of Epoxy Rebar so GTI Composite Slab Bolster®GTI Composite Slab Bolster provided a stronger, more cost effective solution to bar support needs while assuring a zero corrosion liability for project engineers . |
Owner: North Texas Tollway Authority (NTTA) in Joint Venture with TXDOT
Engineer: North Texas Tollway Authority (NTTA)
Size: 11.5 mile loop system around Dallas, TX including four bridges
Contractor: Williams Brothers Construction, Houston, TX
RB Supplier: CMC - ABC Coating
RB Installer: Indus Construction, LP |